Files
nut-ups/bluewalker-vfi-icr/README.md
T

64 lines
2.2 KiB
Markdown

# NUT config: PowerWalker VFI ICR IoT
Network UPS Tools setup for a PowerWalker VFI ICR IoT UPS.
- **Master**: one host connected to the UPS via **USB** (`nutdrv_qx`), runs
`upsd` + `upsmon`, and serves status to the network on port `3493/tcp`.
- **Clients**: any other Linux hosts run `upsmon` as network slaves and shut
down gracefully when the master signals a power failure (FSD).
This avoids the undocumented Modbus TCP register map entirely. If you ever
want a pure-network (no USB) setup, you would need the Modbus register map
from PowerWalker support plus the `nutdrv_modbus` driver -- not used here.
## Layout
```
master/etc/nut/ config for the USB-connected host
client/etc/nut/ config for each network slave
install-master.sh deploy + permissions on the master
install-client.sh deploy on a client: sudo ./install-client.sh <MASTER_IP>
```
## Quick start
### Master (USB host)
```
sudo ./install-master.sh
# edit /etc/nut/upsd.users -> set monmaster / monslave passwords
# edit /etc/nut/upsmon.conf -> set the same monmaster password
sudo nutdrv_qx -a test -DD -x port=auto # confirm the driver reads values
sudo systemctl enable --now nut-server nut-monitor
upsc ups@localhost
```
If the test shows no/garbled values, retry with:
```
sudo nutdrv_qx -a test -DD -x port=auto -x protocol=voltronic -x novendor
```
and uncomment the matching lines in `master/etc/nut/ups.conf`.
### Each client
```
sudo ./install-client.sh <MASTER_IP>
# edit /etc/nut/upsmon.conf -> set the monslave password
sudo systemctl enable --now nut-monitor
upsc ups@<MASTER_IP>
```
## Notes
- Open `3493/tcp` on the master firewall for your client subnets.
- `runtimecal` in `ups.conf`: these UPS models may not report runtime;
NUT then estimates it. Format: `sec_at_full,full_pct,sec_at_half,half_pct`.
Adjust to your battery / EBM configuration.
- `upsd.users` holds plaintext credentials and is gitignored. Keep the real
file off the repo; distribute it out of band (or via your secrets tooling).
- To also cut UPS output power after the master shuts down, look into
`upsdrvctl shutdown` / the `POWERDOWNFLAG` mechanism -- intentionally left
out here to keep the first deployment simple.